AccessDocs
latest

Contents:

  • MMA Key Terms and Concepts
  • MMA Geoprocessing Toolbox
  • Chapter 30 Transit Accessibility Scoring
    • Recommended Working Directory Structure
    • Chapter 30 Project Scoring Toolbox
    • Chapter 30 Transit Project Scoring Workflow
      • Data Preparation
      • Network Setup
      • MMA Processing
      • Score Development
    • Chapter 30 Transit Project Standard Report
  • Chapter 30 Quality Assurance
AccessDocs
  • Docs »
  • Chapter 30 Transit Accessibility Scoring »
  • Chapter 30 Transit Scoring Workflow Overview
  • Edit on Bitbucket

Chapter 30 Transit Scoring Workflow OverviewΒΆ

The Chapter 30 project scoring process follows this general workflow:

  1. Prepare data
  2. Network setup
  3. Run accessibility tools
  4. Quality assurance
  5. Prepare Chapter 30 Transit Project Report
_images/chapter_30_transit_workflow.png
  • Data Preparation
    • Maryland Statewide Transportation Model
    • Existing transit network GTFS feeds
    • Project Transit Network
    • Standard GTFS Tables
  • Network Setup
    • Step 1: Create feature dataset
    • Step 2: Generate transit lines and stops
    • Step 3: Generate Stop-Street Connectors
    • Step 4: Build Network Dataset
    • Step 5: Get Network EIDs
  • MMA Processing
    • 1. Define Decay Curves
    • 2. Create Skims (CS)
    • 3. Produce average travel times skim
    • 4. Summarize accessibility
    • 5. Calculate change in accessibility
  • Score Development
    • 1. Define project study area
    • 2. Map project study area
    • 3. Calculate weighted average
    • 4. Calculate travel time savings
Next Previous

© Copyright 2018, Renaissance Planning Revision 999a14b0.

Built with Sphinx using a theme provided by Read the Docs.